Geben Sie eine Aktie oder eine Kryptowährung in der Suchleiste an, um eine Zusammenfassung zu erhalten
MAST ENERGY DEV. LS -001
97DMAST Energy Developments PLC engages in the development and production of power generation projects in the United Kingdom. It operates Pyebridge project, a 9 MW reserve power (RP) plant located in Derbyshir; Bordesley Project, a 5 MW gas powered RP site; Rochdale Project, a 4.4 MW capacity gas-powered RP site located in the West Midlands; the Hindlip project, a 7.5 MW capacity gas-powered standby generation facility located in Worcester; and the Stather, a 2.4 MW capacity gas-powered RP plant located in Scunthorpe, Lincolnshire. The company was incorporated in 2020 and is based in London, the United Kingdom. MAST Energy Developments PLC operates as a subsidiary of Kibo Mining Cyprus Limited. Address: Salisbury House, London, United Kingdom, EC2M 5PS
Analytics
Zielpreis von Wall Street
–KGV
–Dividendenrendite
–Laufendes Jahr
Letztes Jahr
Laufendes Quartal
Letztes Quartal
Laufendes Jahr
Letztes Jahr
Laufendes Quartal
Letztes Quartal
Schlüsselzahlen 97D
Dividenden-Analyse 97D
Dividendenwachstum über 5 Jahre
–Kontinuierliches Wachstum
–Ausschüttungsquote 5-Jahres-Durchschnitt
–Verlauf der Dividende 97D
Bewertung der Aktie 97D
Finanzen 97D
Ergebnisse | 2019 | Dynamik |