Especifique uma ação ou criptomoeda na barra de pesquisa para obter um resumo
MAST ENERGY DEV. LS -001
97DMAST Energy Developments PLC engages in the development and production of power generation projects in the United Kingdom. It operates Pyebridge project, a 9 MW reserve power (RP) plant located in Derbyshir; Bordesley Project, a 5 MW gas powered RP site; Rochdale Project, a 4.4 MW capacity gas-powered RP site located in the West Midlands; the Hindlip project, a 7.5 MW capacity gas-powered standby generation facility located in Worcester; and the Stather, a 2.4 MW capacity gas-powered RP plant located in Scunthorpe, Lincolnshire. The company was incorporated in 2020 and is based in London, the United Kingdom. MAST Energy Developments PLC operates as a subsidiary of Kibo Mining Cyprus Limited. Address: Salisbury House, London, United Kingdom, EC2M 5PS
Analytics
Preço Alvo de Wall Street
–Rácio P/E
–Rendimento de dividendos
–Ano atual
Ano passado
Trimestre Atual
Ultimo quarto
Ano atual
Ano passado
Trimestre Atual
Ultimo quarto
Figuras chave 97D
Análise de Dividendos 97D
Crescimento de dividendos em 5 anos
–Crescimento contínuo
–Taxa de pagamento em média de 5 anos
–Histórico de Dividendos 97D
Avaliação de ações 97D
Relatório 97D
Acompanhe as principais métricas de cada ação em um só lugar, sem complicações
Inscreva-se no premiumResultados | 2019 | Dinâmica |