Introduzca una acción o criptomoneda en el cuadro de búsqueda para obtener un resumen
MAST ENERGY DEV. LS -001
97DMAST Energy Developments PLC engages in the development and production of power generation projects in the United Kingdom. It operates Pyebridge project, a 9 MW reserve power (RP) plant located in Derbyshir; Bordesley Project, a 5 MW gas powered RP site; Rochdale Project, a 4.4 MW capacity gas-powered RP site located in the West Midlands; the Hindlip project, a 7.5 MW capacity gas-powered standby generation facility located in Worcester; and the Stather, a 2.4 MW capacity gas-powered RP plant located in Scunthorpe, Lincolnshire. The company was incorporated in 2020 and is based in London, the United Kingdom. MAST Energy Developments PLC operates as a subsidiary of Kibo Mining Cyprus Limited. Address: Salisbury House, London, United Kingdom, EC2M 5PS
Analytics
Precio Objetivo de WallStreet
–Relación P/E
–Rentabilidad por dividendo
–Año en curso
Año anterior
Trimestre actual
Último trimestre
Año en curso
Año anterior
Trimestre actual
Último trimestre
Cifras clave 97D
Análisis de dividendos 97D
Aumento del dividendo durante 5 años
–Crecimiento continuo
–Ratio de pago medio en 5 años
–Tendencia del payout 97D
Valoración de la acción 97D
Finanzas 97D
Realice un seguimiento de las métricas clave de cada acción en un solo lugar y sin complicaciones
Hazte premiumResultados | 2019 | Dinámica |